"Heat-Power Industry of Russia in 2011-2016 Investment projects and description of generating companies of Russia" ( ).


"Heat-Power Industry of Russia in 2011-2016 Investment projects and description of generating companies of Russia" ( ).

  • Release date: 11.09.2012
  • Number page: 507
  • Lang. report: English
  • Price:45000   704 USD   639 EUR
Industry Profile Heat-Power Industry of Russia in 2011-2016 an information product within the framework of which specialists of INFOLine agency have prepared business-references on all the wholesale, territorial, regional generating companies, as well as a structured description of more than 100 investment projects on construction and reconstruction of thermal power plants which are actively realized at the moment. The current state, problems and prospects for further development of generating capacity of heat-power industry of Russia are analysed by the specialists of analytical agency INFOLine. Detailed information about WGC, TGC and regional companies (operational, financial and investment activities) is collected.
When structuring the investment projects, detailed information about its participants (contractors, designers, equipment suppliers, etc.) is collected. In the Appendix #1 the list of generating facilities is given, with the use of which the power supply under agreements for capacity supply (ACS), which in many respects defines the prospects of further development of thermal generation up to 2016, will be realized. In the Appendix #2 the recommendations about the generating capacities input at thermal power plants of Russia in 2010-2030 declared in the Master plan are provided.
The Industry Profile Heat-Power Industry of Russia in 2011-2016 is prepared on the basis of information sources complex:
  • The official documents of the Government of Russia, the Department of Energy, the Ministry of Economic Development and Trade, the Energy Forecasting Agency, the Transmission System Operator, the Federal Tariff Service, such as:
    • Materials for the Government of the Russian Federations meetings concerning electric power;
    • The corrected Master plan of heat-power industry facilities placement up to 2020 with prospect up to 2030;
    • Energy Strategy of Russia for the period up to 2030;
    • Forecast of Economic Development of Russia for 2012-2014, developed by MEDT;
    • Scheme and programme of development of the UES of Russia for 2011-2017;
    • The project of Development strategy of power engineering industry for 2010-2020.
  • Reports, interview and presentations of Department of Energy of Russias representatives;
  • Proper materials of WGC, TGC and regional companies, including press releases, web-site materials, annual and quarterly reports, investment and purchasing programs;
  • Materials of foreign and Russian expert and analytical centers, investment companies, etc.;
  • Materials of mass media (printed press, electronic media, federal and regional news agencies);
  • Statistical data from official sources for 1991-2010, published at the moment of the research completion.
Profile Contains 2 Current state of Heat-Power Industry of Russia
8 1.1 GDP and power consumption in Russia 8 1.2 Energy efficiency of economy of Russia and the largest world countries
10 1.3 Structure of production of electric power in Russia
11 1.4 Wearing of the equipment of electric power plants
12 1.5 Prospects of power industry in Russia
16 1.6 Role of the innovations in the development of power industry
28 1.7 Main indicators of power industry in Russia
31 1.8 Cost of electric power in Russia and the developted world countries


35 Dynamics and forecast of electric power production and consumption

38 2.1 Dynamics and forecast of electric power production
38 2.2 Structure of power consumption on the IPS of Russia


40 Profile of significant events for electric power industry in 2011-2012 .

45 Consolidation of power assets of the generating companies
45 Modernization of capacities after the ACS performance
46 Governmentalization of the industry
47 Government influence on price forming processes
47 gas rates for industrial consumers and electric power plants
47 "Last mile" contracts
48 The Scheme and program of development of power industry of the Russian Federation subjects in 2011 . 48 Energy saving and increase of power efficiency for the period up to 2020 .
49 About radioactive waste management, modifications in legislation of the RF
49 Mass personnel "cleaning" in power industry
49 Prospects of the industry regulation


49 Activity of WGC, TGC and regional companies

51 3.1 Operating activities of the companies
51 3.2 Financial activity of the companies
56 3.3 Cornerstone investors of WGC and TGC
59 3.4 Investment programs of generating companies


61 "WGC-1, JSC (INTER RJSC of UES, JSC)

68 Investment activity of JSC "WGC-1"

73 Structured description of investment projects JSC "WGC-1"


77 WGC-1, JSC, TNK-BP, JSC: Nizhnevartovsk SDPP, combined cycle block 3(3.1, 3.2) (construction)
77 WGC-1, JSC: Urengoisk SDPP, combined cycle block 3 (construction)
80 WGC-1, JSC: Perm SDPP, combined cycle block 4 (construction)
82 WGC-1, JSC: Verkhnetagil SDPP, combined cycle block 12 ()


84 WGC-2, JSC (Gasprom, JSC)

85 Investment activity of JSC "WGC-2"

91 Structured description of investment projects JSC WGC-2


96 WGC-2, JSC: Kirishsk SDPP, combined cycle block 6 (reconstruction)
96 WGC-2, JSC: Ryazan SDPP, combined cycle block 2 (reconstruction)
98 WGC-2, JSC: Novocherkassk SDPP, combined cycle block 6 (construction)
99 WGC-2, JSC: Novocherkassk SDPP, combined cycle block 7 (reconstruction)
101 WGC-2, JSC: Cherepovets SDPP, combined cycle block 4 (construction)
102 WGC-2, JSC: Adler SDPP, combined cycle blocks 1, 2(construction)
104 WGC-2, JSC: Troitsk SDPP, coal block 10 (construction)
106 WGC-2, JSC: Stavropolsk SDPP, combined cycle blocks 6, 9 (construction)
109 WGC-2, JSC: Serovsk SDPP, combined cycle block 9 (construction)


111 WGC-3, JSC (INTER RJSC of UES, JSC)

113 Investment activity of JSC "WGC-3"

120 Structured description of investment projects JSC WGC-3


124 WGC-3, JSC: Kharanorsk SDPP, coal block 3 (construction)
124 WGC-3, JSC: Cherepetsk SDPP, coal blocks 8 and 9 (construction)
126 WGC-3, JSC: Yuzhnouralsk SDPP-2, combined cycle blocks 1-3 (construction)
129 WGC-3, JSC: Gusinozersk SDPP, coal block of plant 4 (reconstruction)
132 WGC-3, JSC: Dzubginsk (Tuapsinsk) TPP, gas-turbine blocks 1, 2 (construction)


134 E.ON Russia, JSC (E.On)

136 Investment activity of JSC "E.ON Russia"

141 Structured description of investment projects JSC E.ON Russia


144 E.On Russia, JSC: Yaivinsk SDPP, combined cycle block 5 (construction)
144 E.On Russia, JSC: Shatursk SDPP, combined cycle block 7 (construction completed)
146 E.On Russia, JSC: Surgut SDPP-2, combined cycle blocks 7,8 (construction completed)
148 E.On Russia, JSC: Berezovsk SDPP, coal block 3 (construction)


150 Enel WGC-5, JSC (Enel)

152 Structured description of investment projects JSC Enel WGC-5


161 Enel WGC-5, JSC: Refinsk SDPP, system of dry ash and slag removal (construction)
161 Enel WGC-5, JSC: Refinsk SDPP, coal block 5 (reconstruction)
163 Enel WGC-5, JSC: Sredneuralsk SDPP, combined cycle block 12 (construction completed)
165 Enel WGC-5, JSC: Nevinnomyssk SDPP, combined cycle block 14 (construction completed)


167 TGC-1, JSC (Gasprom, JSC)

169 Investment activity of JSC "TGC-1"

175 Structured description of investment projects JSC TGC-1


179 TGC-1, JSC: Pervomaisk CHPP, combined cycle blocks 1, 2 (construction)
179 TGC-1, JSC: Central CHPP, electric power plant 2, blocks 1, 2 (reconstruction)
182 TGC-1, JSC: Pravoberezhye CHPP-5, combined cycle block 2 (construction)


183 TGC-2, JSC (Synthesis Group)

185 Investment activity of JSC "TGC-2"

190 Structured description of investment projects JSC TGC-2


194 TGC-2, JSC: Vologda CHPP, combined cycle block (construction)
194 TGC-2, JSC: CHPP on the basis of Teninsk boilerhouse in Yaroslavl,combined cycle blocks 1,2 (construction)
196 TGC-2, JSC: Kostroma CHPP, power blocks 1, 2 (construction)
198 TGC-2, JSC: Novgorodsk CHPP, combined cycle block (construction)
199 Kudepstinsk CHPP GasElectroStroy, LLC: Kudepstinsk CHPP, combined cycle blocks 1,2
(construction)

201 Mosenergo, JSC (Gasprom, JSC)

203 Investment activity of JSC "Mosenergo"

208 Structured description of investment projects JSC Mosenergo


212 Mosenergo, JSC: CHPP-9, combined cycle block 10 (reconstruction)
212 Mosenergo, JSC: CHPP-12, combined cycle block 10 (construction)
213 Mosenergo, JSC: CHPP-20, combined cycle block (construction)
214 Mosenergo, JSC: CHPP-16, combined cycle block 8 (construction)
215 Mosenergo, JSC: CHPP-26, combined cycle block 8 (construction completed)


217 Quadra Generating company, JSC (ONEXIM Group)

219 Investment activity of JSC "Quadra"

225 Structured description of investment projects JSC Quadra


228 Quadra, JSC: Voronezh CHPP-2, combined cycle blocks 1, 2 (construction completed)
228 Quadra, JSC: Novomoscovsk CHPP, combined cycle block (construction)
230 Quadra, JSC: Lipetsk CHPP-2, combined cycle block (construction)
232 Quadra, JSC: Kaluga CHPP-1, combined cycle block (construction completed)
233 Quadra, JSC: Livensk CHPP, gas-turbine unit (construction)
235 Quadra, JSC: Boilerhouse of Kurtsks North-West region, combined cycle block 1 (construction completed)
236 Quadra, JSC: Dyaghilev CHPP, combined cycle block (construction)


238 TGC-5, JSC (CPP-Holding, CJSC)

239 Investment activity of JSC "TGC-5"

244 Structured description of investment projects JSC TGC-5


247 TGC-5, JSC: Kirov CHPP-3, combined cycle block (construction)
247 TGC-5, JSC: Izhevsk CHPP-1, combined cycle block (construction)
249 TGC-5, JSC: Kirov CHPP-4, combined cycle block (reconstruction)
251 TGC-5, JSC: Novocheboksarovsk CHPP-3, combined cycle block (reconstruction)


252 TGC-6, JSC (CPP-Holding, CJSC)

253 Investment activity of JSC "TGC-6"

259 Structured description of investment projects JSC TGC-6


262 TGC-6, JSC: Novogorsk CHPP, combined cycle block (construction)
262 TGC-6, JSC: Sormovsk CHPP, turbine-generator sets of plants 1, 2 (reconstruction)
264 TGC-6, JSC: Vladimir CHPP-2, combined cycle unit (construction)


265 Volga TGC, JSC (CPP-Holding, CJSC)

267 Investment activity of JSC "Volga TGC"

272 Structured description of investment projects JSC Volga TGC


276 Volga TGC, JSC: Syzransk CHPP, combined cycle block 9 (construction)
276 Volga TGC, JSC: Novokuybyshevsk CHPP, combined cycle blocks 13-15 (construction)
278 Volga TGC, JSC: Samara SDPP, combined cycle blocks 11, 12 (construction)


280 Power-generating sector JSC "LUKOIL"

282 Investment activity of power-generating sector JSC "LUKOIL"

286 Structured description of investment projects of power-generating sector JSC LUKOIL


289 LUKOIL, JSC: Krasnodarsk CHPP, combined cycle block 5 (construction completed)
289 LUKOIL, JSC: Astrakhan SDPP, combined cycle block 5 (construction completed)
291 LUKOIL, JSC: Central boilerhouse in Astrakhan, combined cycle block 1 (construction)
293 LUKOIL, JSC: LLC Stavrolen, combined cycle block (construction)


294 TGC-9, JSC (CPP-Holding, CJSC)

295 Investment activity of JSC "TGC-9"

301 Structured description of investment projects JSC TGC-9


305 TGC-9, JSC: Perm CHPP-6, combined cycle block 6 (construction)
305 TGC-9, JSC: Perm CHPP-9, combined cycle block 12 (construction)
307 TGC-9, JSC: Novobereznikovsk CHPP, combined cycle block 1 (construction)
309 TGC-9, JSC: Novo-Bogoslovsk CHPP, combined cycle block 1 (construction)
311 TGC-9, JSC: Nizhneturinsk SDPP, combined cycle blocks 1, 2 (construction)
313 TGC-9, JSC: Academic CHPP, combined cycle block 1 (construction)


314 "Fortum", JSC (Fortum)

315 Investment activity of JSC "Fortum"

320 Structured description of investment projects JSC Fortum


325 Fortum, JSC: Nyagansk SDPP, combined cycle blocks 1-3 (construction)
325 Fortum, JSC: Chelyabinsk SDPP, 2 combined cycle blocks (construction)
328 Fortum, JSC: Tobolsk CHPP, plant 3 (reconstruction completed)
329 Fortum, JSC: Chelyabinsk CHPP-3, combined cycle block 3 (construction completed)
331 Fortum, JSC: Tyumen CHPP-1, combined cycle block 2 (construction completed)


333 TGC-11, JSC ("INTER RJSC of UES", JSC)

335 Investment activity of JSC "TGC-11"

341 Structured description of investment projects JSC TGC-11


345 TGC-11, JSC: Omsk CHPP-3, combined cycle block (construction)
345 TGC-11, JSC: Omsk CHPP-3 (reconstruction)
347 TGC-11, JSC: Omsk CHPP-5, plants 1, 2 (reconstruction)


349 Kuzbassenergo, JSC ("SUEK", JSC)

350 Investment activity of JSC "Kuzbassenergo"

356 Structured description of investment projects JSC Kuzbassenergo


360 Kuzbassenergo (TGC-12), JSC: Tom-Usinsk SDPP, plants 4, 5 (reconstruction)
360 Kuzbassenergo (TGC-12), JSC: Barnaul CHPP, gas-power block (construction)
362 Kuzbassenergo (TGC-12), JSC: Belovsk SDPP, plants 4, 6 (reconstruction)
363 Kuzbassenergo (TGC-12), JSC: Kuznetsk CHPP, power blocks 14-15 (construction)
364 Kuzbassenergo (TGC-12), JSC: Barnaul CHPP-2, plants 8, 9(reconstruction)


365 Yenisei TGC (TGC-13), JSC (SUEK, JSC)

366 Investment activity of JSC "Yenisei TGC-13"

371 Structured description of investment projects JSC Yenisei TGC-13


374 Yenisei TGC (TGC-13), JSC: Minusinsk CHPP, PT-80 turbine (reconstruction completed)
374 Yenisei TGC (TGC-13), JSC: Krasnoyarsk CHPP-3, coal block 1 (construction completed)
375 Yenisei TGC (TGC-13), JSC: Nazarovsk SDPP, coal power block 7(reconstruction)
377 Yenisei TGC (TGC-13), JSC: Abakan CHPP, coal power block (construction)

378 TGC-14, JSC (LLC "Energopromsbyt")

380 Investment activity of JSC "TGC-14"

386 Structured description of investment projects JSC TGC-14


389 TGC-14, JSC: Ulan-Udensk CHPP-1, plant 7 (reconstruction completed)
389 TGC-14, JSC: Ulan-Udensk CHPP-2, coal blocks 1, 2 (construction)


391 INTER RJSC of UES, JSC (State Atomic Energy Corporation Rosatom)

392 Investment activity of JSC "INTER RJSC of UES"

401 Structured description of investment projects JSC INTER RJSC of UES


404 INTER RJSC of UES, JSC: Kaliningrad CHPP-2, power block 2 (construction completed)
404 INTER RJSC of UES, JSC: Ivanovsk CCGT, power block 2 (construction)


406 "Bahkirenergo", JSC (JSFC Sistema)

408 Investment activity of JSC "Bashkirenergo"

413 Structured description of investment projects JSC Bashkirenergo


416 Bashkirenergo, JSC: Ufimsk CHPP-2, combined cycle block (construction)
416 Bashkirenergo, JSC: Ufimsk CHPP-5, combined cycle blocks 1, 2 (construction)
418 Bashkirenergo, JSC: Zauralsk CHPP, combined cycle block (construction)


420 Generating company, JSC (Tatarstan Government)

422 Investment activity of JSC "Generating company"

426 Irkutskenergo, JSC (EuroSibEnergo, JSC)

429 Structured description of investment projects JSC Irkutskenergo


437 Irkutskenergo, JSC: Lensk TPP, combined cycle blocks 1,2,3 (construction)
437 Irkutskenergo, JSC: Bratsk mini-TPP (construction)


438 "SIBECO, JSC (Mikhael Abyzov)

439 Investment activity of JSC "SIBECO"

444 RJSC Eastern Energy Systems, JSC (Federal Agency for the Administration of State Property)

447 Investment activity of JSC "RJSC of ES of the East"

453 Investment activity of JSC "Yakutskenergo"

455 Structured description of investment projects JSC Yakutskenergo

458 Yakutsk, JSC: Yakutsk SDPP-2, the first and second turns (construction)

458 Investment activity of JSC "Sakhalinenergo"

459 Structured description of investment projects JSC Sakhalinenergo


461 Sakhalinenergo, JSC: Yuzhno-Sakhalin CHPP-1, combined cycle blocks 4,5 (construction)
461 Sakhalinenergo, JSC: Yuzhno-Sakhalin SDPP-2, coal block 1 (construction)


463 Investment activity of JSC "Kamchatskenergo"

464 Structured description of investment projects JSC Kamchatskenergo


466 Kamchatskenergo, JSC: Kamchatsk CHPP-1, changeover of boiler units to popping of natural gas (reconstruction)

466 Investment activity of JSC "Far Eastern generating company"

467 Far Eastern generating company, JSC: Vladivostok CHPP-2, changeover of boiler units to popping of natural gas (reconstruction) 471 Far Eastern generating company, JSC: Construction of GTPP on the basis of Vladivostok CHPP-2 and CSWB (Central Steam-Water Boilerhouse)
473 Far Eastern generating company, JSC: Blagoveshchensk CHPP, coal block 4 (construction)
474 Far Eastern generating company, JSC: Sovgavansk CHPP, coal blocks 1, 2 (construction)
475 The Administration of Primorsk Region: Ussuriisk CHPP, coal power blocks 1,2 (construction)


477 Structured description of investment projects of other companies

478 The Government of Saint-Petersburg: the Yugo-Zapadny CHPP, combined cycle blocks 1, 2, gas-turbine block 3 (construction)
478 Intertechelectro-New generation, LLC: Kurgansk CHPP-2, combined cycle blocks 1, 2 (construction)
480 EuroSibEnergo, JSC: Autozavodska CHPP, combined cycle block (construction)
482 SO of UES, JSC: CHPP in Tarko-Sal region, combined cycle blocks 1,2 (construction)

483 Appendix 1. The Order of the RF Government from August 11, 2010 1334 and modifications of it

484 Appendix 2. Recommendations on inputting in 2010-2030 the generating capacities at thermal power plants of Russia, declared in the Matser plan, MWt

489
Tables
    :
  • GDP, the production of electric power and power capacity of some world countries in 2011
  • Generating and electric grid complexes need for capital investments for 20102030
  • Structure of the installed capacity of the electric power plants of Russia in 20022011, GWt
  • Electric power production in Russia in 2001-2011, bln kWth
  • Electric power balance in Russia for 2011
  • Dynamics forecast of production and export of electric power for 20112013, bln kWth
  • Forecast of power consumption on the UES of Russia for 20112017 (at the beginning of the year), bln kWth
  • Wearing of TPP equipment
  • Wearing of NPP equipment
  • Wearing of HPP equipment
  • Distributive networks of Russia that fulfilled the standard term
  • Dynamics of the installed capacity of electric power plants of the UES of Russia
  • The list of new platforms for placement of TPP of 500 MWt capacity and higher, recommended by the Master plan for construction in the period up to 2030 for basic, maximum and corrected forecasts
  • Forecast of dismantling the equipment at electric power plants of Russia in 2011-2030, GWt
  • Inputs of capacities at thermal power plants of the UES of Russia in 2011-2017, MWt
  • Indicators of strategic development of power industry in the period up to 2030
  • Cornerstone investors and the amount of investments broken down by WGC and TGC
  • Main indicators of investment program of power industry for 2011 (companies with the state participation in the authorized capital)
  • Inputs of capacity at TPP of Russia in 2011
  • The accomplished inputs of capacity at TPP of Russia in 2011 and the transferred ones for 2012
  • The number of competitions carried out by WGC and TGC in 2006-2011.
  • Structure of share capital of JSC WGC-1 in 2011, %
  • Equipment characteristic of electric power plants of JSC WGC-1
  • Structure of fuel balance of JSC WGC-1 in 2011, %
  • The electric power generation of JSC WGC-1 plants in 2004-2011, million kWth
  • The heat power generation of JSC WGC-1 plants in 2005-2011 thousand Gcal
  • Profit-and-loss report of WGC-1 in 2005-2011, thousand rubles (as of the period end)
  • Investment program of JSC WGC-1 for the period up to 2016 as of June 2011
  • Construction of new high-voltage lines aimed at the capacity delivery of JSC WGC-1 electric power plants
  • Structure of share capital of JSC WGC-2 in 2011, %
  • Equipment characteristic of electric power plants of JSC WGC-2
  • Structure of fuel balance of JSC WGC-2 in 2011, %
  • The electric power generation of JSC WGC-2 plants in 2004-2011, million kWth
  • The heat power generation of JSC WGC-2 plants in 2005-2011 thousand Gcal
  • Profit-and-loss report of WGC-2 in 2005-2011, thousand rubles (as of the period end)
  • Investment program of JSC WGC-2 for the period up to 2016 as of April 2012
  • Construction of new high-voltage lines aimed at the capacity delivery of JSC WGC-2 electric power plants
  • Structure of share capital of JSC WGC-3 in 2011, %
  • Equipment characteristic of electric power plants of JSC WGC-3
  • Structure of fuel balance of JSC WGC-3 in 2011, %
  • The electric power generation of JSC WGC-3 plants in 2004-2011, million kWth
  • The heat power generation of JSC WGC-3 plants in 2005-2011 thousand Gcal
  • Profit-and-loss report of WGC-3 in 2005-2011, thousand rubles (as of the period end)
  • Investment program of JSC WGC-3 for the period up to 2019 as of April 2012
  • Construction of new high-voltage lines aimed at the capacity delivery of JSC WGC-3 electric power plants
  • Structure of share capital of JSC E.ON Russia in 2011, %
  • Equipment characteristic of electric power plants of JSC E.ON Russia
  • Structure of fuel balance of JSC E.ON Russia in 2011, %
  • The electric power generation of JSC E.ON Russia plants in 2004-2011, million kWth
  • The heat power generation of JSC E.ON Russia plants in 2005-2011 thousand Gcal
  • Profit-and-loss report of E.ON Russia in 2005-2011, thousand rubles (as of the period end)
  • Investment program of JSC E.ON Russia 3 for the period up to 2014 as of April 2011
  • Construction of new high-voltage lines aimed at the capacity delivery of JSC E.ON Russia electric power plants
  • Structure of share capital of JSC Enel WGC-5 in 2011, %
  • Equipment characteristic of electric power plants of JSC Enel WGC-5
  • Structure of fuel balance of JSC Enel WGC-5 in 2011, %
  • The electric power generation of JSC Enel WGC-5 plants in 2004-2011, million kWth
  • The heat power generation of JSC Enel WGC-5 plants in 2005-2011 thousand Gcal
  • Profit-and-loss report of Enel WGC-5 in 2005-2011, thousand rubles (as of the period end)
  • Investment program of JSC Enel WGC-5 for the period up to 2013 as of April 2012
  • Construction of new high-voltage lines aimed at the capacity delivery of JSC Enel WGC-5 electric power plants
  • Structure of share capital of JSC TGC-1 in 2011, %
  • Equipment characteristic of electric power plants of JSC TGC-1
  • Structure of fuel balance of JSC TGC-1 in 2011, %
  • The electric power generation of JSC TGC-1 plants in 2004-2011, million kWth
  • The heat power generation of JSC TGC-1 plants in 2005-2011 thousand Gcal
  • Profit-and-loss report of TGC-1 in 2005-2011, thousand rubles (as of the period end)
  • Investment program of JSC TGC-1 for the period up to 2016 as of April 2011
  • Construction of new high-voltage lines aimed at the capacity delivery of JSC TGC-1 electric power plants
  • Structure of share capital of JSC TGC-2 in 2011, %
  • Equipment characteristic of electric power plants of JSC TGC-2
  • Structure of fuel balance of JSC TGC-2 in 2011, %
  • The electric power generation of JSC TGC-2 plants in 2004-2011, million kWth
  • The heat power generation of JSC TGC-2 plants in 2005-2011 thousand Gcal
  • Profit-and-loss report of TGC-2 in 2005-2011, thousand rubles (as of the period end)
  • Investment program of JSC TGC-2 for the period up to 2016 as of April 2011
  • Construction of new high-voltage lines aimed at the capacity delivery of JSC TGC-2 electric power plants
  • Structure of share capital of JSC Mosenergo in 2011, %
  • Equipment characteristic of electric power plants of JSC Mosenergo
  • Structure of fuel balance of JSC Mosenergo in 2011, %
  • The electric power generation of JSC Mosenergo plants in 2004-2011, million kWth
  • The heat power generation of JSC Mosenergo plants in 2005-2011 thousand Gcal
  • Profit-and-loss report of Mosenergo in 2005-2011, thousand rubles (as of the period end)
  • Investment program of JSC Mosenergo for the period up to 2015 as of April 2011
  • Construction of new high-voltage lines aimed at the capacity delivery of JSC Mosenergo electric power plants
  • Structure of share capital of JSC Quadra in 2011, %
  • Equipment characteristic of electric power plants of JSC Quadra
  • Structure of fuel balance of JSC Quadra in 2011, %
  • The electric power generation of JSC Quadra plants in 2004-2011, million kWth
  • The heat power generation of JSC Quadra plants in 2005-2011 thousand Gcal
  • Profit-and-loss report of Quadra in 2005-2011, thousand rubles (as of the period end)
  • Investment program of JSC Quadra for the period up to 2016 as of April 2011
  • Construction of new high-voltage lines aimed at the capacity delivery of JSC Quadra electric power plants
  • Structure of share capital of JSC TGC-5 in 2011, %
  • Equipment characteristic of electric power plants of JSC TGC-5
  • Structure of fuel balance of JSC TGC-5 in 2011, %
  • The electric power generation of JSC TGC-5 plants in 2004-2011, million kWth
  • The heat power generation of JSC TGC-5 plants in 2005-2011 thousand Gcal
  • Profit-and-loss report of TGC-5 in 2005-2011, thousand rubles (as of the period end)
  • Investment program of JSC TGC-5 for the period up to 2015 as of April 2011
  • Construction of new high-voltage lines aimed at the capacity delivery of JSC TGC-5 electric power plants
  • Diadema program of CPP-Holding
  • Structure of share capital of JSC TGC-6 in 2011, %
  • Equipment characteristic of electric power plants of JSC TGC-6
  • Structure of fuel balance of JSC TGC-6 in 2011, %
  • The electric power generation of JSC TGC-6 plants in 2004-2011, million kWth
  • The heat power generation of JSC TGC-6 plants in 2005-2011 thousand Gcal
  • Profit-and-loss report of TGC-6 in 2005-2011, thousand rubles (as of the period end)
  • Investment program of JSC TGC-6 for the period up to 2015 as of April 2011
  • Structure of share capital of JSC Volga TGC in 2011, %
  • Equipment characteristic of electric power plants of JSC Volga TGC
  • Structure of fuel balance of JSC Volga TGC in 2011, %
  • The electric power generation of JSC Volga TGC plants in 2004-2011, million kWth
  • The heat power generation of JSC Volga TGC plants in 2005-2011 thousand Gcal
  • Profit-and-loss report of Volga TGC in 2005-2011, thousand rubles (as of the period end)
  • Investment program of JSC Volga TGC for the period up to 2013 as of April 2011
  • Facilities of technical re-equipment and reconstruction of JSC Volga TGC up to 2016
  • Structure of share capital of LLC YuG TGC-8 in 2011, %
  • Technical characteristics of the power-generating sector LUKOILs plants
  • Structure of fuel balance of LLC YuG TGC-8 in 2008, %
  • The electric power generation of the power-generating sector LUKOILs companies in 2009-2011, million kWth
  • The heat power generation of LLC YuG TGC-8 plants in 2005-2011 thousand Gcal
  • Profit-and-loss report of LLC YuG TGC-8 in 2005-2011, thousand rubles (as of the period end)
  • Investment program of LLC YuG TGC-8 for the period up to 2013 as of April 2011
  • Construction of new high-voltage lines aimed at the capacity delivery of LLC YuG TGC-8 electric power plants
  • Structure of share capital of JSC TGC-9 in 2011, %
  • Equipment characteristic of electric power plants of JSC TGC-9
  • Structure of fuel balance of JSC TGC-9 in 2010, %
  • The electric power generation of JSC TGC-9 plants in 2005-2011, million kWth
  • The heat power generation of JSC TGC-9 plants in 2005-2011 thousand Gcal
  • Profit-and-loss report of TGC-9 in 2005-2011, thousand rubles (as of the period end)
  • Investment program of JSC TGC-9 for the period up to 2017 as of April 2011
  • Construction of new high-voltage lines aimed at the capacity delivery of JSC TGC-9 electric power plants
  • Structure of share capital of JSC Forum in 2011, %
  • Equipment characteristic of electric power plants of JSC Fortum
  • Structure of fuel balance of JSC Fortum in 2010, %
  • The electric power generation of JSC Fortum plants in 2005-2011, million kWth
  • The heat power generation of JSC Fortum plants in 2005-2011 thousand Gcal
  • Profit-and-loss report of Fortum in 2005-2011, thousand rubles (as of the period end)
  • Investment program of JSC Fortum for the period up to 2015 as of April 2011
  • Construction of new high-voltage lines aimed at the capacity delivery of JSC Fortum electric power plants
  • Structure of share capital of JSC TGC-11 in 2011, %
  • Equipment characteristic of electric power plants of JSC TGC-11
  • Structure of fuel balance of JSC TGC-11 in 2010, %
  • The electric power generation of JSC TGC-11 plants in 2005-2011, million kWth
  • The heat power generation of JSC TGC-11 plants in 2005-2011 thousand Gcal
  • Profit-and-loss report of TGC-11 in 2005-2011, thousand rubles (as of the period end)
  • Investment program of JSC TGC-11 for the period up to 2015 as of April 2011
  • Structure of share capital of JSC Kuzbassenergo in 2011, %
  • Equipment characteristic of electric power plants of JSC Kuzbassenergo
  • Structure of fuel balance of JSC Kuzbassenergo in 2010, %
  • The electric power generation of JSC Kuzbassenergo plants in 2005-2011, million kWth
  • The heat power generation of JSC Kuzbassenergo plants in 2005-2011 thousand Gcal
  • Profit-and-loss report of Kuzbassenergo in 2005-2011, thousand rubles (as of the period end)
  • Investment program of JSC Kuzbassenergo for the period up to 2014 as of April 2011
  • Structure of share capital of JSC Yenisei TGC-13 in 2011, %
  • Equipment characteristic of electric power plants of JSC Yenisei TGC-13
  • Structure of fuel balance of JSC Yenisei TGC-13 in 2010, %
  • The electric power generation of JSC Yenisei TGC-13 plants in 2005-2011, million kWth
  • The heat power generation of JSC Yenisei TGC-13 plants in 2005-2011 thousand Gcal
  • Profit-and-loss report of Yenisei TGC-13 in 2005-2011, thousand rubles (as of the period end)
  • Investment program of JSC Yenisei TGC-13 for the period up to 2013 as of April 2011
  • Construction of new high-voltage lines aimed at the capacity delivery of JSC Yenisei TGC-13 electric power plants
  • Structure of share capital of JSC TGC-14 in 2011, %
  • Equipment characteristic of electric power plants of JSC TGC-14
  • Structure of fuel balance of JSC TGC-14 in 2010, %
  • The electric power generation of JSC TGC-14 plants in 2005-2011, million kWth
  • The heat power generation of JSC TGC-14 plants in 2005-2011 thousand Gcal
  • Profit-and-loss report of TGC-14 in 2005-2011, thousand rubles (as of the period end)
  • Investment program of JSC TGC-14 for the period up to 2015 as of April 2011
  • Structure of share capital of JSC INTER RJSC of UES in 2011, %
  • Equipment characteristic of electric power plants of JSC INTER RJSC of UES, situated on the territory of Russia
  • Structure of fuel balance of JSC INTER RJSC of UES in 2010, %
  • The electric power generation of JSC INTER RJSC of UES plants in 2005-2011, million kWth
  • The heat power generation of JSC INTER RJSC of UES plants in 2005-2011 thousand Gcal
  • Profit-and-loss report of INTER RJSC of UES in 2005-2011, thousand rubles (as of the period end)
  • Investment program of JSC INTER RJSC of UES for the period up to 2012 as of April 2011
  • Construction of new high-voltage lines aimed at the capacity delivery of JSC INTER RJSC of UES electric power plants
  • Structure of share capital of JSC Bashkirenergo in 2011, %
  • Equipment characteristic of electric power plants of JSC Bashkirenergo
  • Structure of fuel balance of JSC Bashkirenergo in 2010, %
  • The electric power generation of JSC Bashkirenergo plants in 2005-2011, million kWth
  • The heat power generation of JSC Bashkirenergo plants in 2005-2011 thousand Gcal
  • Profit-and-loss report of Bashkirenergo in 2005-2011, thousand rubles (as of the period end)
  • Investment program of JSC Bashkirenergo for the period up to 2012 as of April 2011
  • Structure of share capital of JSC Tatenergo in 2011, %
  • Equipment characteristic of electric power plants of JSC Tatenergo
  • Structure of fuel balance of JSC Tatenergo in 2009, %
  • Performance indicators of JSC Tatenergo in 2006-2011, million kWth
  • The heat power generation of JSC Tatenergo plants in 2005-2011 thousand Gcal
  • Profit-and-loss report of Tatenergo in 2005-2011, thousand rubles (as of the period end)
  • Equipment characteristic of electric power plants of JSC SibEco
  • Structure of fuel balance of JSC SibEco in 2010, %
  • Performance indicators of JSC SibEco in 2006-2011, million kWth
  • The heat power generation of JSC SibEco plants in 2005-2011 thousand Gcal
  • Profit-and-loss report of SibEco in 2005-2011, thousand rubles (as of the period end)
  • Structure of share capital of JSC Irkutsenergo in 2011, %
  • Characteristics of electric power plants of JSC Irkutskenergo
  • Performance indicators of JSC Irkutskenergo in 2006-2011, million kWth
  • The heat power generation of JSC Irkutskenergo plants in 2005-2011 thousand Gcal
  • Profit-and-loss report of Irkutskenergo in 2005-2011, thousand rubles (as of the period end)
  • Investment program of JSC Irkutskenergo for the period up to 2020 as of April 2012
  • Structure of share capital of JSC RJSC of ES of the East in 2011, %
  • Characteristics of electric power plants of JSC RJSC of ES of the East
  • Structure of fuel balance of JSC RJSC of ES of the East in 2010, %
  • The electric power generation of JSC RJSC of ES of the East plants in 2005-2011, million kWth
  • The heat power generation of JSC RJSC of ES of the East plants in 2005-2011 thousand Gcal
  • Profit-and-loss report of RJSC of ES of the East in 2008-2011, thousand rubles (as of the period end)
  • Investment program of JSC Yakutskenergo for the period up to 2017 as of April 2012
  • Investment program of JSC Sakhalinenergo for the period up to 2015 as of April 2012
  • Investment program of JSC Kamchatskenergo for the period up to 2015 as of April 2012
  • Investment program of JSC Far Eastern generating company for the period up to 2020 as of April 2012
Diagrams
  • Dynamics of power consumption in Russia and GDP in 1991-2011, bln kWth
  • Structure of production of electric power in Russia in 2011, %
  • Structure of installed power capacities in Russia at the beginning of 2012, %
  • The installed capacities of TPP in 2010 and the forecast for 2030, GWt
  • The installed power capacities of Russia in 2011 and the forecast for 2030, GWt
  • The forecasted change of generating capacities of Russia in 2011-2030, GWt
  • Structure of power industry of the RF in 2011 and the amount of the necessary investments up to 2030
  • Dynamics of the installed capacity of the electric power plants of Russia in 1985-2011 and the forecast for 2011, GWt
  • Dynamics of equipment input of electric generating companies in 1951-2011, %
  • Structure of the installed capacity on Federal Districts considering the situation at the beginning of 2011, GWt
  • Structure of the installed capacity on Federal Districts considering the situation at the beginning of 2011, %
  • Structure of GRP on Federal Districts in 2011, %
  • Price forecast for electric power for industrial enterprises in Russia, Germany and the USA, euro/100 kWth
  • Dynamics of electric power production depending on the generation type in 2001-2011, bln kWth
  • Maximum loading of electric power plants of Russia in 1991-2011, GWt
  • Structure of power consumption on the IPS in 2011, %
  • Structure of power consumption on the IPS of Russia in 2017(forecast), %
  • Structure of power consumption on economic activity categories in 2011, %
  • Change of generating capacities of Russia in 1986-2011, GWt
  • The corrected forecast of power consumption up to 2030, bln kWth
  • Structure of power consumption on economic activity categories in 2030 (forecast), %
  • Installed capacity need up to 2030, GWt
  • The forecasted change of generating capacities of Russia in 2011-2030, GWt
  • Structure of installed power capacities in Russia at the beginning of 2012, %
  • Structure of installed power capacities in Russia in 2030 (forecast), %
  • Dynamics of generating capacities changes on generation types up to 2030, GWt
  • Dynamics of electric power generation by the generating companies in 2007-2011, million kWt
  • Electric power production with 1MWt of installed capacity for 2011, million kWth
  • Equipment average age of WGC, TGC and regional companies for 2011, age
  • Structure of the generating companies fuel balance, %
  • Revenue of generating companies in 2011, million rubles
  • Revenue rated at 1 MWt of installed capacity in 2011, million rubles
  • Structure of installed capacities on WGC, TGC and regional companies in 2011, %
  • Structure of installed capacities on WGC, TGC and regional companies in 2015-2017 (forecast), %
  • Structure of capacities input in companies up to 2016, %
  • Structure of installed capacities of WGC, TGC broken down by the cornerstone investors in 2011, %
  • Structure of installed capacities broken down by the cornerstone investors in 2015-2017 (forecast), %
  • Dynamics of the installed capacities of TPP generating companies in 2011-2016, MWt
  • Structure of installed capacities of WGC-1 electric power plants in 2011, MWt
  • Structure of power generation on WGC-1 electric power plants in 2011, %
  • Structure of installed capacities of WGC-1 electric power plants in 2011, %
  • Structure of installed capacities of WGC-1 electric power plants in 2016, %
  • Structure of installed capacities of WGC-2 electric power plants in 2011, MWt
  • Structure of power generation on WGC-2 electric power plants in 2011, %
  • Structure of installed capacities of WGC-2 electric power plants in 2011, %
  • Structure of installed capacities of WGC-2 electric power plants in 2017, %
  • Structure of installed capacities of WGC-3 electric power plants in 2011, MWt
  • Structure of power generation on WGC-3 electric power plants in 2011, %
  • Structure of installed capacities of WGC-3 electric power plants in 2011, %
  • Structure of installed capacities of WGC-3 electric power plants in 2015, %
  • Structure of installed capacities of E.ON Russia electric power plants in 2011, MWt
  • Structure of power generation on E.ON Russia electric power plants in 2011, %
  • Structure of installed capacities of E.ON Russia electric power plants in 2011, %
  • Structure of installed capacities of E.ON Russia electric power plants in 2014, %
  • Structure of installed capacities of Enel WGC-5 electric power plants in 2011, MWt
  • Structure of power generation on Enel WGC-5 electric power plants in 2011, %
  • Structure of installed capacities of Enel WGC-5 electric power plants in 2011, %
  • Structure of installed capacities of Enel WGC-5 electric power plants in 2013, %
  • Structure of installed capacities of TGC-1 electric power plants in 2011, MWt
  • Structure of power generation on TGC-1 branches in 2011, %
  • Structure of installed capacities of TGC-1 electric power plants in 2011, %
  • Structure of installed capacities of TGC-1 electric power plants in 2016, %
  • Structure of installed capacities of TGC-2 electric power plants in 2011, MWt
  • Structure of power generation on TGC-2 branches in 2011, %
  • Structure of installed capacities of TGC-2 electric power plants in 2011, %
  • Structure of installed capacities of TGC-2 electric power plants in 2016, %
  • Structure of installed capacities of Mosenergo electric power plants in 2011, MWt
  • Structure of power generation on Mosenergo electric power plants in 2011, %
  • Structure of installed capacities of Mosenergo electric power plants in 2011, %
  • Structure of installed capacities of Mosenergo electric power plants in 2011, %
  • Structure of installed capacities of Quadra electric power plants in 2011, MWt
  • Structure of power generation on Quadra electric power plants in 2011, %
  • Structure of installed capacities of Quadra electric power plants in 2011, %
  • Structure of installed capacities of Quadra electric power plants in 2016, %
  • Structure of installed capacities of TGC-5 electric power plants in 2011, MWt
  • Structure of power generation on TGC-5 branches in 2011, %
  • Structure of installed capacities of TGC-5 electric power plants in 2011, %
  • Structure of installed capacities of TGC-5 electric power plants in 2015, %
  • Structure of installed capacities of TGC-6 electric power plants in 2011, MWt
  • Structure of power generation on TGC-6 branches in 2011, %
  • Structure of installed capacities of TGC-6 electric power plants in 2011, %
  • Structure of installed capacities of TGC-6 electric power plants in 2015, %
  • Structure of installed capacities of TGC-7 electric power plants in 2011, MWt
  • Structure of power generation on TGC-7 branches in 2011, %
  • Structure of installed capacities of TGC-7 electric power plants in 2011, %
  • Structure of installed capacities of TGC-7 electric power plants in 2013, %
  • Structure of installed capacities of YuGC TGC-8 electric power plants in 2011, MWt
  • Structure of power generation on YuGC TGC-8 branches in 2011, %
  • Structure of installed capacities of YuGC TGC-8 electric power plants in 2011, %
  • Structure of installed capacities of YuGC TGC-8 electric power plants in 2014, %
  • Structure of installed capacities of TGC-9 electric power plants in 2011, MWt
  • Structure of power generation on TGC-9 branches in 2011, %
  • Structure of installed capacities of TGC-9 electric power plants in 2011, %
  • Structure of installed capacities of TGC-9 electric power plants in 2017, %
  • Structure of installed capacities of Fortum electric power plants in 2011, %
  • Structure of installed capacities of Fortum electric power plants in 2015, %
  • Structure of installed capacities of TGC-11 electric power plants in 2011, MWt
  • Structure of power generation on TGC-11 branches in 2011, %
  • Structure of installed capacities of TGC-11 electric power plants in 2011, %
  • Structure of installed capacities of TGC-11 electric power plants in 2015, %
  • Structure of installed capacities of Kuzbassenergo electric power plants in 2011, MWt
  • Structure of power generation on Kuzbassenergo branches in 2011, %
  • Structure of installed capacities of Kuzbassenergo electric power plants in 2011, %
  • Structure of installed capacities of Kuzbassenergo electric power plants in 2014, %
  • Structure of installed capacities of Yenisei TGC-13 electric power plants in 2011, MWt
  • Structure of power generation on Yenisei TGC-13 electric power plants in 2011, %
  • Structure of installed capacities of Yenisei TGC-13 electric power plants in 2011, %
  • Structure of installed capacities of Yenisei TGC-13 electric power plants in 2014, %
  • Structure of installed capacities of TGC-14 electric power plants in 2011, MWt
  • Structure of power generation on TGC-14 electric power plants in 2011, %
  • Structure of installed capacities of TGC-14 electric power plants in 2011, %
  • Structure of installed capacities of TGC-14 electric power plants in 2015, %
  • Structure of installed capacities of Inter RJSC of UES electric power plants in 2011, MWt
  • Structure of power generation on Inter RJSC of UES electric power plants in 2011, %
  • Production and import-export of electric power of Inter RJSC of UES in 2004-2011, million kWth
  • Structure of installed capacities of Inter RJSC of UES electric power plants in 2011, %
  • Structure of installed capacities of Inter RJSC of UES electric power plants in 2011, %
  • Structure of installed capacities of Bashkirenergo electric power plants in 2011, MWt
  • Structure of power generation by Bashkirenergo 2011 , million kWt
  • Structure of installed capacities of Bashkirenergo electric power plants in 2011, %
  • Structure of installed capacities of Bashkirenergo electric power plants in 2013, %
  • Structure of installed capacities of Irkutskenergo electric power plants in 2011, MWt
  • Structure of power generation on Irkutskenergo electric power plants in 2011, million kWth
  • Structure of installed capacities of Irkutskenergo electric power plants in 2011, %
  • Structure of installed capacities of Irkutskenergo electric power plants in 2020, %
  • Structure of installed capacities of RJSC of ES of the East companies in 2011, MWt
  • Structure of power generation by RJSC of ES of the East companies 2011, million kWth
  • Structure of installed capacities of Yakutskenergo in 2011, %
  • Structure of installed capacities of Yakutskenergo in 2017, %
  • Structure of installed capacities of Sakhalinenergo 2011, %
  • Structure of installed capacities of Sakhalinenergo 2016, %
  • Structure of installed capacities of Far Eastern generating company in 2011, %
  • Structure of installed capacities of Far Eastern generating company in 2020, %

:

INFOLine!

1 2019 - INFOLine : .

, ,   .



:




FoodTech

Fast food

Fast casual

-

Fine dining

1 .

,   INFOLine : +7(495) 772-7640 +7(812) 322-6848 . 184 retail@infoline.spb.ru .

: